Upgrade Kit 12-15/16 long leads IEC
Diagnostic ECG Patient Cables and Leads









Upgrade Kit 12-15/16 long leads IEC

Diagnostic ECG Patient Cables and Leads
Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.

Specifications
  • ECG Diagnostic ECG Patient Cables and Leads
    Patient Application
    Child; Adult
    Application Site
    Limb; Chest
    Lead Set Length
    48 in (1.22m)
    Number of Leads
    16
    Shielded
    Shielded
    Electrode Attachment Method
    Alligator Clip
    Color Coding
    IEC
  • Product details
    Product Category
    ECG
    Use with Non-Philips Healthcare Equipment
    No
    Use with Philips Healthcare Equipment
    860315, 860310
    Product Type
    Diagnostic ECG Patient Cables and Leads
    Single-Patient Use OR Multi-Patient Use
    Multi-Patient Use
    CE Certified
    Yes
    Not manufactured with natural rubber latex
    Yes
    Packaging Unit
    1
    Minimum Shelf Life
    None
    Sterile OR Non-Sterile
    Non-Sterile
    Use with Other Supplies
    N/A

Documentation

Enhancing ECG quality application note
PDF|312.73 KB

Related products

  • PageWriter Cardiograph
    The Philips PageWriter TC50 cardiograph is an advanced, reliable, and compact ECG solution, that is easy to use. The TC50 will help you meet your daily demands, giving you time to focus on your patients.
  • PageWriter Cardiograph
    Philips PageWriter TC70 cardiograph is designed to simplify diagnostic ECG testing and streamline workflow – where an automated workflow and outstanding clinical support is critical.
Disclaimer
Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.